0

Location of channel after moving from master application to function group

Jamy 6 years ago in IQANdesign updated by Gustav Widén (System support) 6 years ago 1

I'm using IQANdesign 5.04.14.5377. When laying out a new machines program, typically all the I/O is placed in the master application just as a place holder. Then, function groups are setup and the I/O is arranged into the desired function groups for programming the control logic. The issue is when a channel is dropped from the master app to the new function group, it lands way down the page. It take 20-30 sec. to grab the channel and move it back to the top of the page. is this a glitch or was this intended to be this way?  

When moving a channel between function groups, it will keep its coordinates. 

I am guessing that is what you may be experiencing?