Copying Adjust group

Brandon Devine (KTC) 1 year ago in IQANdesign updated by Gustav Widén (System support) 8 months ago 3

Hello,

Question. I have an adjust group full of Integer Parameters. Lets called this adjust group A. I have copies of the same Integer Parameters that are tied to a different Input that I want to put in adjust group B. I want to take these copies and put them into another adjust group and use the same minimum, maximum, and step size as the integer parameters in adjust group A, into adjust group B. My problem is that whenever I copy adjust group A to make adjust group B, and then change the channel to one of the copies, it not only changes the channel for adjust group B. It changes the channel for adjust group A as well. Is there a way to prevent that from happening?

Under review

Thanks for posting. I checked and the this clearly looks like a bug. 

To give a little more information, the bug is that it is possible to change channel on the adjust item. It used to be locked. 

Fixed

The bug is that it was possible to change channel on the adjust item is fixed in 7.00