+1
Fixed
Copying Adjust group
Brandon Devine (KTC) 2 years ago
in IQANdesign
•
updated by Gustav Widén (System support) 1 year ago •
3
Hello,
Question. I have an adjust group full of Integer Parameters. Lets called this adjust group A. I have copies of the same Integer Parameters that are tied to a different Input that I want to put in adjust group B. I want to take these copies and put them into another adjust group and use the same minimum, maximum, and step size as the integer parameters in adjust group A, into adjust group B. My problem is that whenever I copy adjust group A to make adjust group B, and then change the channel to one of the copies, it not only changes the channel for adjust group B. It changes the channel for adjust group A as well. Is there a way to prevent that from happening?
Customer support service by UserEcho
Thanks for posting. I checked and the this clearly looks like a bug.
To give a little more information, the bug is that it is possible to change channel on the adjust item. It used to be locked.
The bug is that it was possible to change channel on the adjust item is fixed in 7.00